Home > Blog > Industrial Wastewater Treatment Equipment Q&A

Contact Us

Mr. Xu Pengfei
Chat Now

Your inquiry content must be between 10 to 5000 characters

Please enter Your valid email address

Please enter a correct verification code.

Industrial Wastewater Treatment Equipment Q&A

Q1: Our wastewater has very high oil and suspended solid content. Can your air flotation machine clean it?

A: For food, slaughterhouse, or chemical wastewater with high concentrations of oil and suspended solids, we recommend using high-efficiency dissolved air flotation (DAF) machines or micro-nano bubble air flotation technology. These devices typically achieve removal rates of 95%-98% for SS (Suspended Solids) and grease. To be safe, we strongly suggest you send us water samples so we can conduct a small-scale lab test for you and let the real data speak for itself.

4

Q2: We have intermittent drainage with large fluctuations in water volume. Can the equipment adapt?

A: Yes, it can adapt. We will design a regulation pool with sufficient capacity (typically accommodating 6-8 hours of wastewater volume) in the pretreatment stage for you. Combined with variable frequency lift pumps and intelligent control systems, it can effectively smooth out the impact load of water volume and quality fluctuations, ensuring that the backend treatment equipment always operates under stable conditions.

 Q&A (General Business & After-sales)

Q1: How long does it take from placing an order to completing installation and commissioning?

A: For standard models of integrated equipment, if in stock, they can be shipped within a week at the fastest; for non-standard customized projects, the production cycle is usually around 15-25 days. After the equipment arrives on site, we will send professional engineers to guide the installation and commissioning. Generally, small projects can complete commissioning and start water flow operations within 3-5 days.

Q2: What is the warranty period for the equipment? How are core components handled if they break?

A: The whole machine typically comes with a 1-2 year warranty period. Core components (such as blowers, water pumps, membrane modules, etc.) enjoy specific manufacturer warranties. As a source factory, we always keep a sufficient inventory of spare parts. In case of failure, we can ship replacements via express delivery as fast as possible to minimize the impact on your project operations.